Production and Operations Management
Break even point = Fixed cost / Selling price-Variable Cost
DFA-Design for assembly
Layout:
Process layout: Similar machines & services are located together
Product layout
Fixed position layout
CRAFT-Computerized Relative Allocation of Facilities Techniques
ALDEP-Automated Layout Design Program
EOQ= Square root of (2 x ordering cost x no of units/Carrying cost)
ABC Analysis based on demand
Material Consumption value
10% 70%
20% 20%
70% 10%
Aggregate planning: Graphical method/Heuristic method/Transportation method/Linear programming
MPS-Master Production Schedule-- Productwise
MRP - Material Requirement Planning(Quantity and Time for acquiring the required items)
MRP Inputs---- BOM(Bill of items), MPS(Master production schedule),EOQ(Economic Order Quantity)
Lot sizing-- Minimum order quantity
MRP-- Projected requirements, Planned order release, EOQ, Scheduled repairs, Stock in hand
CRITICAL PATH METHOD-Deterministic Time Estimate
TF--Total float
ES--Earliest start time
LC--Latest Completion time
D--Duration of activity
TF = LC-ES-D
PERT -
Gantt chart--- Resource levelling
Time study-- FW Taylor
Control charts:
X chart- Central tendency
R chart-- Dispersion of observations
contol charts
Fishbone or Ishikawa Diagram --- Kaoru Ishikawa
SQC- Statistical quality control
AQC-Acceptable quality level
Fixed layout
Process/Functional layout: is used for batch production
Product/Line layout: Continuous mass flow production
DFA-Design for assembly
Layout:
Process layout: Similar machines & services are located together
Product layout
Fixed position layout
CRAFT-Computerized Relative Allocation of Facilities Techniques
ALDEP-Automated Layout Design Program
EOQ= Square root of (2 x ordering cost x no of units/Carrying cost)
ABC Analysis based on demand
Material Consumption value
10% 70%
20% 20%
70% 10%
Aggregate planning: Graphical method/Heuristic method/Transportation method/Linear programming
MPS-Master Production Schedule-- Productwise
MRP - Material Requirement Planning(Quantity and Time for acquiring the required items)
MRP Inputs---- BOM(Bill of items), MPS(Master production schedule),EOQ(Economic Order Quantity)
Lot sizing-- Minimum order quantity
MRP-- Projected requirements, Planned order release, EOQ, Scheduled repairs, Stock in hand
CRITICAL PATH METHOD-Deterministic Time Estimate
TF--Total float
ES--Earliest start time
LC--Latest Completion time
D--Duration of activity
TF = LC-ES-D
PERT -
Gantt chart--- Resource levelling
Time study-- FW Taylor
Control charts:
X chart- Central tendency
R chart-- Dispersion of observations
contol charts
Fishbone or Ishikawa Diagram --- Kaoru Ishikawa
SQC- Statistical quality control
AQC-Acceptable quality level
Fixed layout
Process/Functional layout: is used for batch production
Product/Line layout: Continuous mass flow production